                           Project Management                                                                                      • Civil Cost Advantage (higher roofs = higher cost of

                                                                                                                                   construction)
                         = Profit Management                                                                                       • Smaller Room Size (lowering the fan size and motors
                                                                                                                                   hence lower operating cost, Chilling cost)
                                                                                                                                   • Efficient cleaning (lesser pockets for fluff to deposits,
                                                                                                                                   hence lesser manual labour)
            Project Management and Textile Sector has not been   of deptts.                                                        • Lesser Lux drops (general lighting fixed on higher
            synonymous to each other. Major fact is that investor of                                                               ceilings drop lux, so key areas need re-lighting which is
            the textile industry has been doing project management   Now, it is time that all segments of textiles from spinning   multiplication of resources)
            for planning expansions at their own, sometimes they   to garments, need a review of process and total
            undergo plant expansions with the help of existing   transformation. Unit Mills need to be designed on a               Over Head Cleaners (applicable on certain machines)
            production and utility personnel.                 lowest possible operating loads. All the textile                     Capital expenditure on the Overhead Cleaners is atleast
                                                              segmentation can avail advantage of saving                           40% additional cost, above the cost of AHU (in general).
            Additional expense of hiring a Project Manager has   multi-millions with incorporations of project                     In order to accommodate track and cleaner atleast
            always been realized as extravaganza. “Planner should   management.                                                    0.85m of ceiling space is required. While comparing to                       Top Side of Skylight – Weaving Hall
            take the ownership of planning” has caused                                                                             general height 4m in spinning and weaving units we
            INVESTORS only believe the wordings of the Production                                                                  can understand that there is 21% reduction in room size
            Managers and Utility Heads. The main disadvantage of                                                                   (i.e lower ceiling) if we don’t have to accommodate the
            this so called strategy, always resulted in extra setup   Segmentation        Saving Potentials                        overhead cleaner space. Overhead cleaner operation
            cost and huge running cost.                        Spinning                   10 ~ 15 % of operative loads             (blow cleaning) can be compensated with a retrofit
                                                                                                                                   suction system or blow pipes system which can
                                                               Weaving                    10 ~ 15 % of operative loads
            Orthodox Planning – Production built               Processing (All sectors, finishing and denim)  upto 30 % of operative loads  operate in interval and can blow clean from machine.
            Let’s take a look at our conventional approach of
            planning. The main criteria for planning expansions, has   Garments processing (including Denim)  upto 30% of operative loads
            always been based on quantity of textiles to be                                                                                                   Supply Duct
            produced, converting to machine requirements
            eventually converting into Utility loads required to run   A rough estimation of transformation can save us
            those machines. Job of utility engineers becomes clear   One can easily imagine that saving on 15 ~ 30% of
            and they simply setup the required utilities with a certain   operative loads means multi millions, enough to boost         Removable height
            idle capacity for surge loads. Hence, on a certain   profit. Further in the article, we will cover, how our      Ceiling height                       O/H cleaner
            operative cost, path of finance deptt. is set to a norm for   wastes are going to become our advantages by                                                                                          Top Side of Skylight – Weaving Hall
            all running costs. Investors, later, simply indulge in   incorporating project management and Hence Profit
            marketing of produced stuff and hence never find time again   Management.
            to review the whole process, merely in yearly meetings.                                                                                      Loom/Machine               It can even provide lux upto 450plus depending upon
                                                              Spinning and Weaving                                                                                                  conditions while not transferring the heat.
            Practically, there are two estates within a state of Mills   Spinning and weaving are relatively closer in following                                                    Further, Its common to reduce the lighting load with use
            i.e. Utility Block and Production Block. Investors could   context.                                                                                                     of LEDs which can reduce 50 ~ 70% lighting load
            have never realized about what they could do if they                                                                                                                    depending upon lighting arrangement being used.
            would have setup a single purpose built Mills with   Power consumption is mainly split in following three              Lighting Load
            incorporation of Project Management.              categories, i.e. Machine Power Load, Humidification                  Lighting load can be compensated for good Six hours   In next chapter, we will discuss the finishing and
                                                              load, lighting load. Machine power load discussion is                with use of daylighting via Sky lights. A number of   garments processing and we review various new
            Scientific Planning – Purpose built               not scope of article. We are also not discussing benefits            lighting techniques are there like sun pipe, skylights etc.   method which will organize utility and production block
            As the order conditions of the globe is getting softer and   of insulation which are known to everyone, these days.    Sunoptic Skylights is most effective and cheaper so far.   as one unit.
            local crisis for energy/labour charges is getting worse,   AHU Load and Lighting Load are majorly concerned
            the demand for competitiveness in the market is   with building of the production halls. Lets take a
            growing. An old saying “fittest to survive” is on every   separate dig on each.                                                                        Mian Rashid Mahmood
            wall, but it is difficult to perceive how? The solution goes
            all into un-practiced segment i.e. Project Management.   AHU Load                                                                                      B.Sc. Textile (Processing)
            It says that if all of your horses are running in one   AHU Load is directly concerned with room size ; bigger                                         MBA (Marketing)
            direction, only then one can have synergy. The solution   the room size, higher the AHU operation cost. In a given                                     Project Manager (US Denim for 9 and 1/2 years)
            is investing into “one unbiased driver”, taking no favors,   foot print, necessary for machine installation and                                        Previous Sapphire Finishing Mills
            no sides, setting the direction of all of your horses. This   movement corridors, we still can play with ceiling                                       Previous Rupafab
            One un-biased driving force is project management    height. Reducing the ceiling height will give                                                     Previous Nishat Dyeing & Finishing
            which can save millions of dollars monthly with synergy   following advantages.